• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 41. Hydraulic Lines.
Figure 43. Plate.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1113    1114    1115    1116    1117  1118  1119    1120    1121    1122    1123  
img
.
TM 5-2410-241-23-2
0187
INSTALLATION CONTINUED
N OT E
Install hoses as noted during removal.
10. Install new gasket (Figure 42, Item 4), elbow (Figure 42, Item 15), four washers (Figure 42, Item 14), and bolts
(Figure 42, Item 13) on hydraulic tank (Figure 42, Item 16).
11. Install washer (Figure 42, Item 12) and three new O-rings (Figure 42, Item 10) on fitting (Figure 42, Item 2).
12. Install fitting (Figure 42, Item 2), washer (Figure 42, Item 7), and nut (Figure 42, Item 6) on hydraulic tank
(Figure 42, Item 16).
13. Install hose (Figure 42, Item 8) and tighten tube nut (Figure 42, Item 9) on fitting (Figure 42, Item 2).
14. Install hose (Figure 42, Item 3) and tighten tube nut (Figure 42, Item 11) on fitting (Figure 42, Item 2).
15. Install hose (Figure 42, Item 1) and tighten tube nut (Figure 42, Item 5) on fitting (Figure 42, Item 2).
Figure 42. Elbow.
0187
0187-35


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.