• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Pilot Accumulator.
Figure 6. Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1175    1176    1177    1178    1179  1180  1181    1182    1183    1184    1185  
img
.
TM 5-2410-241-23-2
0194
INSTALLATION
000194
N OT E
Install hose as noted in removal.
1. Position hose (Figure 5, Item 3) on machine.
2. Install clamp (Figure 5, Item 4), hose (Figure 5, Item 3), washer (Figure 5, Item 6), and bolt (Figure 5, Item 5)
on hydraulic suction tube (Figure 5, Item 7).
3. Install hose (Figure 5, Item 3) and new tiedown strap (Figure 5, Item 8) on hydraulic suction tube (Figure 5,
Item 7).
4. Install new O-ring (Figure 5, Item 2) on pilot accumulator (Figure 5, Item 1).
5. Connect hose (Figure 5, Item 3) on pilot accumulator (Figure 5, Item 1).
6. Close front access on hydraulic tank.
Figure 5. Pilot Accumulator.
0194
0194-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.