• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HYDRAULIC IMPLEMENT PUMP PILOT ACCUMULATOR HOSE REPLACEMENT - Continued
Figure 3. Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1172    1173    1174    1175    1176  1177  1178    1179    1180    1181    1182  
img
.
TM 5-2410-241-23-2
0194
REMOVAL CONTINUED
N OT E
Note position and orientation of hose to aid installation.
1. Disconnect hose (Figure 1, Item 2) from elbow (Figure 1, Item 3) on implement pump (Figure 1, Item 1).
2. Remove elbow (Figure 1, Item 3) from spacer (Figure 1, Item 4).
Figure 1. Implement Pump to Pilot Accumulator.
0194
3. Remove two O-rings (Figure 2, Items 2 and 3) from elbow (Figure 2, Item 1). Discard O-rings.
Figure 2. Elbow.
0194
0194-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.