• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Clamps.
Figure 5. Pilot Accumulator.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1174    1175    1176    1177    1178  1179  1180    1181    1182    1183    1184  
img
.
TM 5-2410-241-23-2
0194
REMOVAL CONTINUED
6. Open front access on hydraulic tank.
7. Disconnect hose (Figure 4, Item 3) from pilot accumulator (Figure 4, Item 1).
8. Remove O-ring (Figure 4, Item 2) from pilot accumulator (Figure 4, Item 1). Discard O-ring.
9. Remove tiedown strap (Figure 4, Item 8) and hose (Figure 4, Item 3) from hydraulic suction tube (Figure 4,
Item 7). Discard tiedown strap.
10. Remove bolt (Figure 4, Item 5), washer (Figure 4, Item 6), clamp (Figure 4, Item 4), and hose (Figure 4, Item 3)
from hydraulic suction tube (Figure 4, Item 7). Remove hose from machine.
Figure 4. Pilot Accumulator.
0194
END OF TASK
CLEANING AND INSPECTION
000194
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0194-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.