TM 5-2410-241-23-2
0194
INSTALLATION CONTINUED
9. Install two new O-rings (Figure 7, Items 2 and 3) on elbow (Figure 7, Item 1).
Figure 7. Elbow.
0194
N OT E
Install elbow as noted during removal.
10. Install elbow (Figure 8, Item 3) on spacer (Figure 8, Item 4).
11. Connect hose (Figure 8, Item 2) on elbow (Figure 8, Item 3) on implement pump (Figure 8, Item 1).
Figure 8. Implement Pump to Pilot Accumulator.
0194
END OF TASK