• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Clamps.
HYDRAULIC IMPLEMENT PUMP PILOT ACCUMULATOR HOSE REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1177    1178    1179    1180    1181  1182  1183    1184    1185    1186    1187  
img
.
TM 5-2410-241-23-2
0194
INSTALLATION CONTINUED
9. Install two new O-rings (Figure 7, Items 2 and 3) on elbow (Figure 7, Item 1).
Figure 7. Elbow.
0194
N OT E
Install elbow as noted during removal.
10. Install elbow (Figure 8, Item 3) on spacer (Figure 8, Item 4).
11. Connect hose (Figure 8, Item 2) on elbow (Figure 8, Item 3) on implement pump (Figure 8, Item 1).
Figure 8. Implement Pump to Pilot Accumulator.
0194
END OF TASK
0194-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.