• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Implement Pump to Main Hydraulic Control Valve.
Figure 4. Flange.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1167    1168    1169    1170    1171  1172  1173    1174    1175    1176    1177  
img
.
TM 5-2410-241-23-2
0193
REMOVAL CONTINUED
8. Remove nut (Figure 3, Item 1), washer (Figure 3, Item 2), and two spring tension clips (Figure 3, Item 3) from
hose (Figure 3, Item 5).
9. Remove two spring tension clips (Figure 3, Item 3) and grommet (Figure 3, Item 4) from hose (Figure 3,
Item 5).
10. Remove four bolts (Figure 3, Item 6), washers (Figure 3, Item 7), and hose (Figure 3, Item 5) from main
hydraulic control valve (Figure 3, Item 8). Remove hose from machine.
11. Remove preformed packing (Figure 3, Item 9) from hose (Figure 3, Item 5). Discard preformed packing.
Figure 3. Main Hydraulic Control Valve.
0193
END OF TASK
CLEANING AND INSPECTION
000193
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0193-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.