• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Implement Pump to Steering Motor Tee.
HYDRAULIC IMPLEMENT PUMP MAIN CONTROL VALVE HOSE REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1164    1165    1166    1167    1168  1169  1170    1171    1172    1173    1174  
img
. . .
6
TM 5-2410-241-23-2
0193
FIELD MAINTENANCE
-
HYDRAULIC IMPLEMENT PUMP MAIN CONTROL VALVE HOSE REPLACEMENT
01
93
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0295
0
(WP 0302, Item 65)
0
Equipment Condition
0
Gloves, Rubber (S0208)
Hydraulic system pressure released
(WP 0302, Item 68)
0
(WP 0186)
Goggles (S0209)
0
Hydraulic system drained (WP 0184)
(WP 0302, Item 68)
0
0
Front and rear floor plates removed
Materials/Parts
(WP 0230)
0
0
Cap Set, Protective
Right platform access panels removed
(WP 0303, Item 4)
(WP 0208)
0
0
Rag, Wiping (WP 0303, Item 24)
0
Drawing Required
0
Tag, Marker (WP 0303, Item 34)
0
TM 5-2410-241-24P, Figure 82
O-ring (3)
0
0
Preformed Packing
Estimated Time to Complete
0
0
Seal
6.0 Hr
0
0
0193-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.