TM 5-2410-241-23-3
0206
INSTALLATION CONTINUED
N OT E
Route harness as noted during removal.
Install all electrical connectors as noted during removal.
12. Position harness (Figure 23, Item 3) on platform (Figure 23, Item 4).
13. Connect connector (Figure 23, Item 1) to connector (Figure 23, Item 2).
Figure 23. Arctic Heater Harness Connectors.
0206