• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Brake Solenoid Wiring.
Figure 29. Fuse Box Cables.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  141    142    143    144    145  146  147    148    149    150    151  
img
.
TM 5-2410-241-23-3
0206
INSTALLATION CONTINUED
N OT E
Install cables as tagged during removal.
23. Connect two cables (Figure 28, Items 1 and 4) to fuse box (Figure 28, Item 5) and install two washers
(Figure 28, Item 2) and bolts (Figure 28, Item 3).
Figure 28. Fuse Box Connection.
0206
0206-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.