• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 23. Arctic Heater Harness Connectors.
Figure 25. Transmission Harness Connectors.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  137    138    139    140    141  142  143    144    145    146    147  
img
.
TM 5-2410-241-23-3
0206
INSTALLATION CONTINUED
N OT E
Route harness as noted during removal.
Install all electrical connectors as tagged during removal.
Install tiedown straps as noted during removal.
14. Connect connector (Figure 24, Item 1) on connector (Figure 24, Item 2).
15. Install new tiedown strap (Figure 24, Item 4) on harness (Figure 24, Item 3).
Figure 24. Chassis Harness Connectors.
0206
0206-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.