INSTALLATION CONTINUED
24. Install cover (Figure 29, Item 6), two washers (Figure 29, Item 8), and bolts (Figure 29, Item 7) over cables
(Figure 29, Items 1 and 2).
25. Install two clamps (Figure 29, Item 3), washers (Figure 29, Item 5) and nuts (Figure 29, Item 4) on cables
(Figure 29, Items 1 and 2).
Figure 29. Fuse Box Cables.
0206
0206-29