• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 33. Heater Core Cover.
Figure 35. Steering Control.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  147    148    149    150    151  152  153    154    155    156    157  
img
.
TM 5-2410-241-23-3
0206
INSTALLATION CONTINUED
N OT E
Install all electrical connectors as tagged during removal.
Route harness as noted during removal.
35. Connect connector (Figure 34, Item 2) to connector (Figure 34, Item 5).
36. Install connectors (Figure 34, Items 2 and 5) on harness clamp (Figure 34, Item 4).
37. Connect connector (Figure 34, Item 1) to connector (Figure 34, Item 6).
38. Install new tiedown strap (Figure 34, Item 3) on harness clamp (Figure 34, Item 4).
39. Connect plug (Figure 34, Item 8) to relay (Figure 34, Item 7).
Figure 34. Engine Harness.
0206
0206-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.