• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 35. Steering Control.
LEFT PLATFORM ACCESS PANELS

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  149    150    151    152    153  154  155    156    157    158    159  
img
. . . . . . . . . .
TM 5-2410-241-23-3
0206
FOLLOW-ON TASKS
000206
1. Install batteries (WP 0155).
2. Install bulldozer pilot valve (WP 0259).
3. Install ripper pilot valve (WP 0256).
4. Install fuel tank (WP 0170).
5. Install cab (WP 0245).
6. Install engine enclosure right door guard (WP 0204).
7. Install engine enclosure left door guard (WP 0202).
8. Install hood (WP 0200).
9. Install right platform access panels (WP 0208).
10. Install left platform access panels (WP 0207).
11. Install front and rear floor plates (WP 0230).
12. Install cab seat (WP 0247).
13. Fill hydraulic system (WP 0151).
14. Purge and charge refrigerant in A/C system (WP 0113).
15. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0206-36


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.