18
TM 5-2410-241-23-3
FIELD MAINTENANCE INSTRUCTIONS
-
CAB REPLACEMENT
024
5
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
References
0
0
Tool Kit, General Mechanic's
0
0
Equipment Condition
0
Screwdriver Attachment, Torx, 3/8" Drive,
Machine parked (TM 5-2410-241-10)
0
0
0
0
Lifting Device (5,000-lb capacity)
0
Drawing Required
0
Materials/Parts
0
0
0
Estimated Time to Complete
0
0
4.5 Hr
0
0
Personnel Required
0
Two
0
0245-1