Figure 12. Water Valve Cable Routing.
CAB REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  519    520    521    522    523  524  525    526    527    528    529  
img
.
TM 5-2410-241-23-3
0244
WATER VALVE INSTALLATION CONTINUED
6. Install hose (Figure 13, Item 7) and clamp (Figure 13, Item 6) on water valve (Figure 13, Item 4).
7. Install hose (Figure 13, Item 3) and clamp (Figure 13, Item 2) on water valve (Figure 13, Item 4).
8. Install water valve (Figure 13, Item 4) and four bolts (Figure 13, Item 1) on plate (Figure 13, Item 5).
9. Close left engine enclosure door.
Figure 13. Water Valve Hoses.
0244
END OF TASK
FOLLOW-ON TASKS
000244
1. Fill cooling system (WP 0113).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0244-12