CABLE INSTALLATION CONTINUED
7. Install cable (Figure 8, Item 1) on temperature control (Figure 8, Item 3) and tighten nut (Figure 8, Item 2).
Figure 8. Cable.
0244
8. Install spacer (Figure 9, Item 6), heater control (Figure 9, Item 5), and nut (Figure 9, Item 4) on instrument
panel (Figure 9, Item 3).
9. Install heater control knob (Figure 9, Item 2) on heater control (Figure 9, Item 5) and tighten setscrew (Figure 9,
Item 1).
Figure 9. Heater Control Knob.