• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Cab Interior.
Figure 1. Right Rear Harness Routing.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  171    172    173    174    175  176  177    178    179    180    181  
img
. . . . . . . .
26
TM 5-2410-241-23-3
0209
FIELD MAINTENANCE
-
PLATFORM WIRING HARNESS REPLACEMENT
0
209
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
Platform removed (WP 0206)
0
0
Materials/Parts
Drawing Required
0
0
Rag, Wiping (WP 0303, Item 24)
TM 5-2410-241-24P, Figure 87
0
0
Tag, Marker (WP 0303, Item 34)
Estimated Time to Complete
0
0
Tiedown Strap (WP 0303, Item 36)
0
29.0 Hr
0
References
0
WP 0295
0
0209-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.