Figure 4. Right Front Harness Routing.
Figure 6. Platform Harness to Platform Floor.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  176    177    178    179    180  181  182    183    184    185    186  
img
.
TM 5-2410-241-23-3
0209
REMOVAL CONTINUED
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections and cables to aid installation.
Note number and location of tiedown straps to aid installation.
9. Loosen bolt (Figure 5, Item 8) and disconnect connector (Figure 5, Item 7) from platform (Figure 5, Item 9). Set
harness (Figure 5, Item 1) aside.
10. Remove two bolts (Figure 5, Item 2), washers (Figure 5, Item 3), and five ground cables (Figure 5, Item 4) from
platform (Figure 5, Item 9).
11. Remove tiedown straps (Figure 5, Item 6) from harness (Figure 5, Item 5) and platform (Figure 5, Item 9).
Position harness aside and discard tiedown straps.
Figure 5. Platform Harness to Instrument Panel Harness Connector.
0209
0209-6