• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PLATFORM WIRING HARNESS REPLACEMENT
Figure 2. Right Side Harness Routing.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  172    173    174    175    176  177  178    179    180    181    182  
img
.
TM 5-2410-241-23-3
0209
REMOVAL
000209
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
Note number and location of tiedown straps to aid installation.
1. Remove six bolts (Figure 1, Item 4), washers (Figure 1, Item 3), and three connectors (Figure 1, Item 5) from
platform (Figure 1, Item 1).
2. Remove tiedown straps (Figure 1, Item 2) from harness (Figure 1, Item 6) and platform (Figure 1, Item 1).
Position harness aside and discard tiedown straps.
Figure 1. Right Rear Harness Routing.
0209
0209-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.