Figure 13. Machine ECM Connector.
Figure 15. Left Side Harness Routing.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  183    184    185    186    187  188  189    190    191    192    193  
img
.
TM 5-2410-241-23-3
0209
REMOVAL CONTINUED
N OT E
Note harness routing to aid installation.
Tag and mark all cables to aid installation.
26. Remove bolt (Figure 14, Item 4), washer (Figure 14, Item 3), and four ground cables (Figure 14, Item 2) from
platform (Figure 14, Item 1).
Figure 14. Harness Ground Cables.
0209