• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Harness Ground Cables.
Figure 16. Left Side Harness Routing.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  184    185    186    187    188  189  190    191    192    193    194  
img
. .
TM 5-2410-241-23-3
0209
REMOVAL CONTINUED
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
Note number and location of tiedown straps to aid installation.
27. Loosen bolt (Figure 15, Item 3) and disconnect connector (Figure 15, Item 2) from fuse box (Figure 15, Item 1).
Set connector aside.
28. Disconnect connector (Figure 15, Item 5) from power converter box (Figure 15, Item 4). Set connector aside.
29. Remove tiedown straps (Figure 15, Item 7) from harness (Figure 15, Item 8) and platform (Figure 15, Item 6).
Discard tiedown straps.
30. Remove harness (Figure 15, Item 8) from platform (Figure 15, Item 6).
Figure 15. Left Side Harness Routing.
0209
END OF TASK
CLEANING AND INSPECTION
000209
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0209-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.