• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Left Side Harness Routing.
Figure 17. Harness Ground Cables.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  185    186    187    188    189  190  191    192    193    194    195  
img
.
TM 5-2410-241-23-3
0209
INSTALLATION
000209
N OT E
Install harness as noted during removal.
Install connectors as tagged and marked during removal.
Install tiedown straps as noted during removal.
1. Position harness (Figure 16, Item 8) on platform (Figure 16, Item 6).
2. Install new tiedown straps (Figure 16, Item 7) on harness (Figure 16, Item 8) and platform (Figure 16, Item 6).
3. Connect connector (Figure 16, Item 5) to power converter box (Figure 16, Item 4).
4. Connect connector (Figure 16, Item 2) and install bolt (Figure 16, Item 3) on fuse box (Figure 16, Item 1).
Figure 16. Left Side Harness Routing.
0209
0209-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.