• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Left Side Harness Routing.
Figure 18. Machine ECM Connector.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  186    187    188    189    190  191  192    193    194    195    196  
img
.
TM 5-2410-241-23-3
0209
INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Install cables as tagged and marked during removal.
5. Install four ground cables (Figure 17, Item 2), one washer (Figure 17, Item 3), and bolt (Figure 17, Item 4) on
platform (Figure 17, Item 1).
Figure 17. Harness Ground Cables.
0209
N OT E
Install harness as noted during removal.
Install connectors as tagged and marked during removal.
6. Install connector (Figure 18, Item 2), four washers (Figure 18, Item 4), and bolts (Figure 18, Item 3) on platform
(Figure 18, Item 1).
7. Connect connector (Figure 18, Item 6) and tighten bolt (Figure 18, Item 5) on connector (Figure 18, Item 2).
0209-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.