TM 5-2410-241-23-3
0267
INSTALLATION CONTINUED
N OT E
Install hoses as tagged during removal.
6. Install two new O-rings (Figure 10, Item 6), hoses (Figure 10, Item 2), four flanges (Figure 10, Item 5), eight
washers (Figure 10, Item 4), and bolts (Figure 10, Item 3) on tilt cylinder (Figure 10, Item 1).
Figure 10. Hoses.
0267