• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Fitting.
Figure 9. Retainer and Pin.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  770    771    772    773    774  775  776    777    778    779    780  
img
.
TM 5-2410-241-23-3
0267
INSTALLATION
000267
N OT E
Lubricate O-rings prior to installation.
1. Position new O-ring (Figure 6, Item 3) and fitting (Figure 6, Item 2) on tilt cylinder (Figure 6, Item 1), and install
four washers (Figure 6, Item 5) and bolts (Figure 6, Item 4).
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
N OT E
Tilt cylinder weighs 341 lb (155 kg).
2. Attach sling (Figure 7, Item 2) and lifting device on tilt cylinder (Figure 7, Item 1) and with assistance position
tilt cylinder on machine.
Figure 7. Sling and Lifting Device.
0267
0267-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.