Figure 7. Sling and Lifting Device.
Figure 10. Hoses.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  771    772    773    774    775  776  777    778    779    780    781  
img
.
TM 5-2410-241-23-3
0267
INSTALLATION CONTINUED
N OT E
Install shims as noted in removal.
3. Position four bolts (Figure 8, Item 4), half-yoke (Figure 8, Item 1), and shim pack (Figure 8, Item 2) on machine.
4. Install tilt cylinder (Figure 8, Item 3) and four nuts (Figure 8, Item 5) on machine. Tighten nuts to 460-580 lb-ft
(623-786 Nm).
Figure 8. Yoke.
0267
5. Install pin (Figure 9, Item 3), retainer (Figure 9, Item 2), and two bolts (Figure 9, Item 1) on machine. Tighten
bolts to 293-362 lb-ft (397-490 Nm).
Figure 9. Retainer and Pin.
0267
0267-8