• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Ripper Tilt Cylinder Rod End.
ARCTIC KIT TROUBLESHOOTING INTRODUCTION

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  886    887    888    889    890  891  892    893    894    895    896  
img
. .
TM 5-2410-241-23-3
0282
INSTALLATION CONTINUED
13. Raise ripper carriage (TM 2410-241-10).
14. Remove jack stands from ripper carriage (Figure 8, Item 1) and ripper tilt cylinder.
Figure 8. Ripper Carriage.
0282
END OF TASK
FOLLOW-ON TASKS
000282
1. Install ripper shanks (WP 0281).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0282-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.