TM 5-2410-240-10
0012
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued
LOCATION
ITEM TO BE
CHECKED
OR
EQUIPMENT NOT
ITEM
MAN-
SERVICED
PROCEDURE
READY/AVAILABLE IF:
NO.
INTERVAL HOURS
51
After
Hydraulic
(Cont.)
Tank Sight
Gauge
Figure 24.
Hydraulic Tank Sight Gauge - Type II with Ripper.
0012
52
After
Winch
Check winch assembly for debris, Class III leaks or damage
damage, fluid leaks, wear, or cable that would impair operation
damage. Refer to TB 43-0142.
if required for mission.
53
After
Ripper
a. Check ripper hydraulic cylinder
Class III leaks or damage
that would impair operation,
for leaks.
or missing ripper teeth if
b. Check frame and teeth for
required for mission.
debris, excessive wear, damage, or
missing components.
54
After
Lights
Check rear worklights for missing
Missing or damaged
or damaged components.
components if required for
mission.