• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT IDLER POSITION INSPECTION Inspection
Figure 2. Fuse and Circuit Breaker Identification.

Operator Manual D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  149    150    151    152    153  154  155    156    157    158    159  
img
. . . .
6
TM 5-2410-240-10
0017
OPERATOR MAINTENANCE
-
FUSE AND CIRCUIT BREAKER MAINTENANCE
0017
Removal, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
WRENCH, ADJUSTABLE (WP 0021, Item 8)
Machine parked (WP 0005)
0
0
Fire extinguisher removed from bracket
0
Materials/Parts
0
Estimated Time to Complete
Fuse (as required)
0
0
0.2 Hr
0
REMOVAL
00017
1. Remove four bolts (Figure 1, Item 2), washers (Figure 1, Item 3), and panel cover (Figure 1, Item 1).
Figure 1. Panel Cover.
0017
0017-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.