• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Track Valve Cover.
Figure 4. Track Valve Cover.

Operator Manual D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  157    158    159    160    161  162  163    164    165    166    167  
img
.
TM 5-2410-240-10
0018
TIGHT TRACK ADJUSTMENT CONTINUED
2. Rotate valve (Figure 3, Item 1) counterclockwise to allow grease to escape.
3. Close valve (Figure 3, Item 1).
Figure 3. Track Valve.
0018
0018-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.