• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Ether Valve.
Figure 7. Ether Bracket.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  160    161    162    163    164  165  166    167    168    169    170  
img
.
TM 5-2410-240-23-2
0048
ETHER VALVE AND BRACKET INSTALLATION
00048
1. Install new gasket (Figure 5, Item 12) on ether valve (Figure 5, Item 7).
2. Install bracket (Figure 5, Item 13), washer (Figure 5, Item 15), bolt (Figure 5, Item 14), washer (Figure 5,
Item 2), and nut (Figure 5, Item 1), on bracket (Figure 5, Item 5).
3. Install ether valve (Figure 5, Item 7), clamp (Figure 5, Item 10), bracket (Figure 5, Item 11), cap (Figure 5,
Item 9), and two bolts (Figure 5, Item 8), on bracket (Figure 5, Item 13).
4. Install cap (Figure 5, Item 9) on bracket (Figure 5, Item 11).
5. Install fitting (Figure 5, Item 6) on ether valve (Figure 5, Item 7).
6. Install clamp (Figure 5, Item 4) and nut (Figure 5, Item 3) on bracket (Figure 5, Item 5).
7. Position bracket (Figure 6, Item 2) as shown in (Figure 6).
8. Install washer (Figure 6, Item 8), bolt (Figure 6, Item 9), bracket (Figure 6, Item 1), washer (Figure 6, Item 3),
and nut (Figure 6, Item 4) on bracket (Figure 6, Item 2).
9. Position two harness brackets (Figure 6, Item 7) on bracket (Figure 6, Item 2).
10. Install two washers (Figure 6, Item 8), bolts (Figure 6, Item 9), harness brackets (Figure 6, Item 7), washers
(Figure 6, Item 6), and nuts (Figure 6, Item 5) on bracket (Figure 6, Item 2).
Figure 6. Ether Bracket Rear Harness.
0048
0048-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.