• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Ether Line.
ENGINE ECM AND BRACKET REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  163    164    165    166    167  168  169    170    171    172    173  
img
.
TM 5-2410-240-23-2
0048
ETHER BOTTLE INSTALLATION
00048
1. Install ether bottle (Figure 9, Item 2) on clamp (Figure 9, Item 3) and ether valve (Figure 9, Item 4).
2. Tighten nut (Figure 9, Item 1) and clamp (Figure 9, Item 3) on ether bottle (Figure 9, Item 2).
Figure 9. Ether Bottle.
0048
END OF TASK
FOLLOW-ON TASKS
00048
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0048-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.