TM 5-2410-240-23-2
0048
ETHER VALVE AND BRACKET INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
14. Position harness (Figure 8, Item 5) and connect harness connector (Figure 8, Item 3).
15. Install new tiedown strap (Figure 8, Item 4) on harness connector (Figure 8, Item 3).
N OT E
Install tiedown straps as noted during removal.
16. Install ether injection tube (Figure 8, Item 7) and two new tiedown straps (Figure 8, Item 6) on machine.
17. Install ether injection tube (Figure 8, Item 7) and two tube nuts (Figure 8, Item 2) on fittings (Figure 8, Item 1).
Figure 8. Ether Line.
0048
END OF TASK