TM 5-2410-240-23-2
0076
INSTALLATION CONTINUED
4. Turn fuel valve (Figure 4, Item 3) to the ON position.
5. Install panel (Figure 4, Item 2) and close door (Figure 4, Item 1) on machine.
Figure 4. Door.
0076
END OF TASK
FOLLOW-ON TASKS
00076
1. Install primary fuel filter (WP 0074).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE