TM 5-2410-240-23-2
0080
INSTALLATION
00080
1. Install bolt (Figure 3, Item 4), wastegate solenoid (Figure 3, Item 7), and bolt (Figure 3, Item 8) on machine.
N OT E
Route harness as noted during removal.
2. Route harness (Figure 3, Item 1) from wastegate solenoid (Figure 3, Item 7).
N OT E
A/C accumulator removed for clarity.
Remove caps and install lines as noted during removal.
3. Position lines (Figure 3, Items 2 and 5) on wastegate solenoid (Figure 3, Item 7).
4. Install fitting (Figure 3, Item 6) and fitting (Figure 3, Item 3) on wastegate solenoid (Figure 3, Item 7).
N OT E
Install lines as noted during removal.
5. Install harness (Figure 4, Item 3) on clip (Figure 4, Item 4).
6. Install harness (Figure 4, Item 2) on two clips (Figure 4, Item 1).
Figure 4. Harness.
0080