• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Harness.
EXHAUST MANIFOLD REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  382    383    384    385    386  387  388    389    390    391    392  
img
. .
TM 5-2410-240-23-2
0080
INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Install tiedown straps as noted during removal.
7. Connect electrical connector (Figure 5, Item 1) on harness (Figure 5, Item 2).
8. Install two tiedown straps (Figure 5, Item 3) on harness (Figure 5, Item 2).
Figure 5. Connector.
0080
END OF TASK
FOLLOW-ON TASKS
00080
1. Install turbocharger (WP 0079).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0080-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.