• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Pump O-ring.
Figure 6. Pump.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  686    687    688    689    690  691  692    693    694    695    696  
img
.
TM 5-2410-240-23-2
0122
INSTALLATION CONTINUED
NOTE
Remove caps and install hoses as noted during removal.
2. Install pump (Figure 5, Item 9) and bolts (Figure 5, Item 8) on machine.
3. Tighten tee fitting (Figure 5, Item 7) 1/4 turn.
4. Install new O-ring (Figure 5, Item 4) on hose (Figure 5, Item 6).
5. Install hose (Figure 5, Item 6) and tighten tube nut (Figure 5, Item 5) on pump (Figure 5, Item 9).
6. Install elbow (Figure 5, Item 10), new O-ring (Figure 5, Item 4), fitting (Figure 5, Item 3), and new O-ring
(Figure 5, Item 11) on tee fitting (Figure 5, Item 7).
7. Install hose (Figure 5, Item 1) and tighten tube nut (Figure 5, Item 2) on pump (Figure 5, Item 9).
Figure 5. Pump.
0122
0122-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.