• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Tube and O-ring.
Figure 9. Pump.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  717    718    719    720    721  722  723    724    725    726    727  
img
.
TM 5-2410-240-23-2
0125
INSTALLATION
000125
1. Install new O-ring (Figure 7, Item 2) on tube (Figure 7, Item 1).
Figure 7. Tube and O-ring.
0125
2. Install new O-ring (Figure 8, Item 2) on pump (Figure 8, Item 1).
Figure 8. Pump O-ring.
0125
0125-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.