• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Starter Cables.
Figure 4. A/C Lines.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  764    765    766    767    768  769  770    771    772    773    774  
img
.
TM 5-2410-240-23-2
0133
REMOVAL CONTINUED
5. Remove two bolts (Figure 2, Item 4), washers (Figure 2, Item 5), clamps (Figure 2, Item 3) and spacers (Figure
2, Item 6) from engine (Figure 2, Item 7).
6. Remove clamps (Figure 2, Item 3) from cable (Figure 2, Item 8).
7. Remove tiedown strap (Figure 2, Item 2) from harness (Figure 2, Item 1). Position harness aside and discard
tiedown strap.
Figure 2. Positive Cable.
0133
8. Remove nut (Figure 3, Item 1), washer (Figure 3, Item 4), clamp (Figure 3, Item 2) from bracket (Figure 3,
Item 5).
9. Remove clamp (Figure 3, Item 2) from cable (Figure 3, Item 3).
Figure 3. Cable Clamps.
0133
0133-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.