• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Batteries and Retaining Hardware.
Figure 13. Junction Box Harness.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  876    877    878    879    880  881  882    883    884    885    886  
img
.
TM 5-2410-240-23-2
0142
INSTALLATION
000142
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Failure to follow this warning may result in death or injury to
personnel.
N OT E
Each battery weighs approximately 60 lb (27 kg).
1. Install front battery (Figure 12, Item 4) on machine (Figure 12, Item 5).
2. Install rod (Figure 12, Item 3) on machine (Figure 12, Item 5).
3. Install rear battery (Figure 12, Item 2) on machine (Figure 12, Item 5).
4. Install battery hold-down (Figure 12, Item 1) on front battery (Figure 12, Item 4) and rear battery (Figure 12,
Item 2).
Figure 12. Batteries and Retaining Hardware.
0142
0142-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.