• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Junction Box Harness.
Figure 17. Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  878    879    880    881    882  883  884    885    886    887    888  
img
.
TM 5-2410-240-23-2
0142
INSTALLATION CONTINUED
N OT E
Connect electrical connectors as noted during removal.
10. Connect jumper cable (Figure 15, Item 3) to two battery terminals (Figure 15, Item 4).
11. Tighten two nuts (Figure 15, Item 2) on two terminals (Figure 15, Item 5).
12. Install two terminal covers (Figure 15, Item 1) on two terminals (Figure 15, Item 5).
Figure 15. Jumper Cable.
0142
13. Install clamp (Figure 16, Item 4), clamp (Figure 16, Item 1), washer (Figure 16, Item 3), and bolt (Figure 16,
Item 2) on battery hold-down (Figure 16, Item 5).
Figure 16. Battery Cable Retaining Hardware.
0142
0142-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.