• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Battery Brackets and Clamps.
Figure 1. Cable Connection at Battery Disconnect Switch.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  883    884    885    886    887  888  889    890    891    892    893  
img
. .
6
TM 5-2410-240-23-2
0143
FIELD MAINTENANCE
-
BATTERY CABLE REPLACEMENT
01
43
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Materials/Parts
Machine parked (TM 5-2410-240-10)
0
0
Rag, wiping (WP 0290, Item 21)
Batteries removed (WP 0142)
0
0
Tag, marker (WP 0290, Item 30)
0
Drawings Required
0
Tiedown strap (WP 0290, Item 31)
0
TM 5-2410-240-24P, Figure 66
Lockwasher
0
0
Estimated Time to Complete
0
2.0 Hr
0
0143-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.