• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Battery Tray.
Figure 22. Battery Brackets and Clamps.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  881    882    883    884    885  886  887    888    889    890    891  
img
.
TM 5-2410-240-23-2
0142
INSTALLATION CONTINUED
N OT E
If equipped with arctic kit heater, perform steps 21 through 23. If not equipped with arctic
kit heater, proceed to step 24.
21. Install two battery cables (Figure 21, Item 3) on two battery terminals (Figure 21, Item 6) with two nuts
(Figure 21, Item 4) and washers (Figure 21, Item 5).
22. Position two terminal covers (Figure 21, Item 1) on two battery terminals (Figure 21, Item 6).
23. Install two tiedown straps (Figure 21, Item 2) on two terminal covers (Figure 21, Item 1).
Figure 21. Arctic Kit Heater Battery Cables.
0142
0142-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.