Figure 21. Arctic Kit Heater Battery Cables.
BATTERY CABLE REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  882    883    884    885    886  887  888    889    890    891    892  
img
.
TM 5-2410-240-23-2
0142
INSTALLATION CONTINUED
24. Position positive battery cable (Figure 22, Item 3) on battery posts (Figure 22, Item 2).
25. Tighten two nuts (Figure 22, Item 1) on positive battery cable (Figure 22, Item 3)
26. Install two battery hold-down brackets (Figure 22, Item 7), bracket clamp (Figure 22, Item 6), spacer
(Figure 22, Item 5), and bolt (Figure 22, item 4) on machine.
27. Position terminal boot covers (Figure 22, Item 8) on battery posts (Figure 22, Item 2).
Figure 22. Battery Brackets and Clamps.
0142
END OF TASK
FOLLOW-ON TASKS
000142
1. Install right rear access cover (WP 0191).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0142-16