• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Harness Connectors and Retaining Hardware Underneath Cab Floor.
Figure 15. Harness Connectors and Retaining Hardware Underneath Cab Floor.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  962    963    964    965    966  967  968    969    970    971    972  
img
.
TM 5-2410-240-23-2
0150
REMOVAL CONTINUED
N OT E
Note location of tiedown straps and tag and mark electrical connectors to aid installation.
32. Disconnect three relays (Figure 14, Item 1) from harness (Figure 14, Item 5).
33. Remove three relays (Figure 14, Item 1) from brackets (Figure 14, Item 2).
34. Remove 10 tiedown straps (Figure 14, Item 4) from harness (Figure 14, Item 5) and from clips (Figure 14,
Item 3). Discard tiedown straps.
N OT E
Assistance is required to pass harness and connectors between HVAC duct and machine.
35. Remove harness (Figure 14, Item 5) from machine (Figure 14, Item 6).
Figure 14. Harness Connectors and Retaining Hardware Underneath Cab Floor.
0150
END OF TASK
CLEANING AND INSPECTION
000150
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
0150-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.