Figure 15. Harness Connectors and Retaining Hardware Underneath Cab Floor.
Figure 17. Harness Ground Connectors Underneath Cab Floor.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  964    965    966    967    968  969  970    971    972    973    974  
img
.
TM 5-2410-240-23-2
0150
INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
5. Install clamp (Figure 16, Item 3) on harness (Figure 16, Item 5).
6. Install clamp (Figure 16, Item 3), washer (Figure 16, Item 6), and bolt (Figure 16, Item 4) on machine
(Figure 16, Item 2).
7. Connect and lock three platform harness connectors (Figure 16, Item 1) to engine and chassis harness
connectors (Figure 16, Item 7).
8. Install new tiedown strap (Figure 16, Item 8) on connector (Figure 16, Item 9).
Figure 16. Harness Connectors and Retaining Hardware Underneath Cab Floor.
0150
0150-17