• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Harness Ground Connectors Underneath Cab Floor.
Figure 14. Harness Connectors and Retaining Hardware Underneath Cab Floor.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  961    962    963    964    965  966  967    968    969    970    971  
img
.
TM 5-2410-240-23-2
0150
REMOVAL CONTINUED
N OT E
Tag and mark electrical connectors to aid installation.
29. Remove tiedown strap (Figure 13, Item 8) from connector (Figure 13, Item 9) and unlock and disconnect three
platform harness connectors (Figure 13, Item 1) from engine and chassis harness connectors (Figure 13,
Item 7). Discard tiedown strap.
30. Remove bolt (Figure 13, Item 4), washer (Figure 13, Item 6), and clamp (Figure 13, Item 3) from machine
(Figure 13, Item 2).
31. Remove clamp (Figure 13, Item 3) from harness (Figure 13, Item 5).
Figure 13. Harness Connectors and Retaining Hardware Underneath Cab Floor.
0150
0150-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.