• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Solenoid, Speed Sensor, Chassis Harness, and Retaining Hardware at Right Hydrostatic Motor.
Figure 15. Harness Retaining Hardware Inside Frame.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1028    1029    1030    1031    1032  1033  1034    1035    1036    1037    1038  
img
.
TM 5-2410-240-23-2
0154
INSTALLATION CONTINUED
N OT E
Install electrical connectors and tiedown straps as noted during removal.
6. Connect and lock chassis harness (Figure 14, Item 2) to pressure sensor (Figure 14, Item 3).
7. Connect chassis harness (Figure 14, Item 2) to solenoid (Figure 14, Item 4) and speed sensor
(Figure 14, Item 1).
8. Install three new tiedown straps (Figure 14, Item 5) on chassis harness (Figure 14, Item 2), solenoid
(Figure 14, Item 4), pressure sensor (Figure 14, Item 3), and speed sensor (Figure 14, Item 1).
Figure 14. Solenoid, Pressure Sensor, Speed Sensor, Chassis Harness, and Retaining Hardware
at Left Hydrostatic Motor.
0154
0154-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.