• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Harness Grounds Above Junction Box.
Figure 7. Machine ECM Harness Connectors and Harness Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1041    1042    1043    1044    1045  1046  1047    1048    1049    1050    1051  
img
.
TM 5-2410-240-23-2
0155
REMOVAL CONTINUED
N OT E
Tag and mark electrical connectors to aid installation.
9. Loosen screw (Figure 5, Item 2) and disconnect harness connector (Figure 5, Item 3) from equipment ECM
(Figure 5, Item 1).
Figure 5. Equipment ECM Harness Connector.
0155
N OT E
Note location of tiedown straps and tag and mark electrical connectors to aid installation.
10. Remove tiedown strap (Figure 6, Item 2) from platform harness (Figure 6, Item 4) and winch solenoid harness
(Figure 6, Item 1).
11. Unlock and disconnect platform harness (Figure 6, Item 4) from winch solenoid harness (Figure 6, Item 1).
12. Disconnect platform harness (Figure 6, Item 4) from harness connector (Figure 6, Item 3).
Figure 6. Harness Connectors Near Junction Box.
0155
0155-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.