• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Crossover Tubes and Clamps.
PILOT HOSE REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1099    1100    1101    1102    1103  1104  1105    1106    1107    1108    1109  
img
. .
TM 5-2410-240-23-2
0157
FOLLOW-ON TASKS
000157
1. Fill hydraulic system (WP 0160).
2. Install bottom guards (WP 0156).
3. Install right rear access panel (WP 0190).
4. Install left rear access panel (WP 0193).
5. Install debris guards (WP 0187).
6. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0157-21/(22 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.